What HVAC shop drawings include, LOD 350 vs. LOD 400, SMACNA requirements, the path from coordinated model to fabrication, and a typical sheet package.

Get a Free Quote
Reviewed by Austin Smith, FounderUpdated November 3, 20265 min read
HVAC Shop Drawings: Fabrication-Ready Duct and Piping Layouts
Quick AnswerHVAC shop drawings turn the engineer’s design into fabrication and installation drawings for ductwork and mechanical piping: duct layouts with sizes, elevations and fitting details, piping layouts, equipment locations, sections and hanger details, coordinated with structure and other trades. They follow SMACNA standards and the project specifications, and are submitted for engineer review before fabrication.

Design drawings show where systems should go; shop drawings show exactly how they will be built. For sheet metal shops, they also feed fabrication and cut lists. This guide explains what HVAC shop drawings include.

How this guide was prepared: written and reviewed by the Design Estimation drafting and estimating team, led by founder Austin Smith (7+ years in construction estimating and drafting). Every sheet we issue is drafted to the engineer’s design and checked by a person before delivery.

What HVAC Shop Drawings Include

DrawingContent
Duct layoutsSizes, elevations, fittings, dampers and access doors
Fitting detailsElbows, transitions and takeoffs for fabrication
Piping layoutsHydronic and refrigerant piping, valves and specialties
Equipment plansUnits, curbs, clearances and connections
SectionsCoordination at tight areas and crossings
Hanger and support detailsSupports, seismic bracing where required
Submittal setSheets and data for engineer review
Request a Free Quote

Fill in your details and we’ll get back to you with a quote.

  • Quote reply within 1 hour
  • Estimates in 24–48 hours
  • Prepared by human estimators
Service
This field is required.
This field is required.
This field is required.

Design Drawings vs. Shop Drawings

Engineer’s drawings are often single-line and diagrammatic. Shop drawings show real duct sizes, insulation, fittings and elevations, and they resolve conflicts with beams, sprinklers, cable tray and lights. See our guide to what shop drawings are.

LOD 350 vs. LOD 400 for HVAC

LOD 350LOD 400
PurposeCoordination between tradesFabrication and installation
Duct and pipeCorrect size, routing and elevationExact fittings, joints, connectors and lengths for the shop
Hangers and supportsShown where they affect clearanceEvery hanger and support located
Used forClash detection and coordination sign-offFabrication export, spool sheets and field layout

Most HVAC shop drawing packages are modeled to LOD 350 for coordination, then taken to LOD 400 for the areas the shop will fabricate. Our BIM level of development guide explains each level.

From Coordinated Model to Fabrication

  1. Model the ductwork and piping in Revit with the specified gauge, pressure class, insulation and fitting types.
  2. Coordinate with structure, sprinklers, plumbing, electrical and ceilings, and run clash detection in Navisworks.
  3. Issue the submittal set of plans, sections and details for engineer review.
  4. Revise to review comments and resubmit until approved.
  5. Export for fabrication: fitting and straight-run data for the shop’s fabrication software, such as CAMduct, and spool sheets for piping.
  6. Issue field drawings with hanger locations and elevations for installation crews.

Standards and Coordination

  • SMACNA: duct construction, reinforcement and sealing by pressure class.
  • Specifications: gauge, materials, insulation and testing.
  • Coordination: MEP and structural overlays, ideally in a BIM model, so clashes are resolved before fabrication. See our MEP shop drawing guide.

Regional Requirements

Seismic regions need bracing details; hurricane regions need equipment anchorage and wind-rated curbs; local codes may add fire and smoke damper requirements. Shop drawings should reflect the requirements in the contract documents and local code.

Typical Package: Three-Storey Medical Office

Sheet setContents
Floor duct plans (3 levels)Duct sizes, bottom-of-duct elevations, dampers and access doors
Roof planRTU curbs, duct penetrations and equipment clearances
Mechanical room planPiping, valves, pumps and equipment connections
SectionsTight corridors where duct, sprinkler mains and cable tray cross
DetailsHangers, seismic bracing, fire damper installation and duct connections
Fabrication dataFitting and straight-run export for the sheet metal shop

Medical buildings carry more fire and smoke dampers, higher air change rates and tighter ceiling spaces than standard offices, so coordination sections and damper details make up a larger share of the package.

What to Send

  • Mechanical design drawings and specifications.
  • Architectural and structural backgrounds or models.
  • Equipment submittals.
  • Your CAD or Revit standards and fabrication preferences.

How Design Estimation Helps

We prepare HVAC and MEP shop drawings in AutoCAD and Revit through our shop drawing services, and can also provide duct takeoffs for pricing. For full-building MEP coordination drawings, see our MEP drafting guide. Send your drawings.

Share This Entry

FAQ

Frequently Asked Questions

Quick answers to the questions contractors ask us most.

  • What are HVAC shop drawings?

    They are detailed fabrication and installation drawings for ductwork, piping and equipment, prepared from the engineer’s design.

  • Do HVAC shop drawings follow SMACNA?

    Yes. Duct construction, reinforcement and sealing follow SMACNA standards and the specifications.

  • Are shop drawings coordinated with other trades?

    Yes. They are overlaid with structural and other MEP systems so conflicts are resolved before fabrication.

  • Can you produce shop drawings in Revit?

    Yes. We work in AutoCAD and Revit, depending on the project requirement.

  • How fast can HVAC shop drawings be prepared?

    Timing depends on project size; we confirm the delivery date before starting, and engineer redlines are typically turned around within 24 hours.

  • Are shop drawings prepared by AI or human drafters?

    Our shop drawings are prepared and checked by experienced human drafters.

  • What is the difference between LOD 350 and LOD 400 HVAC drawings?

    LOD 350 is for coordination; LOD 400 is for fabrication. LOD 350 shows correct sizes, routing and elevations to resolve clashes. LOD 400 adds exact fittings, joints, hangers and lengths so the shop can fabricate from the model.