General Contractor & Preconstruction Services
Full-scope quantity takeoffs and pre-bid pricing so general contractors can bid commercial, industrial, and public work with confidence.
General Contractor Estimating
Preconstruction cost estimating covering CSI Divisions 02 through 33, with full plan sets audited for scope gaps before bid day.
Constructability Review & Scope Gap Analysis
Senior estimators audit architectural and engineering drawings before construction to find plan discrepancies, design errors, and likely RFIs.
Project Scheduling & CPM Baseline
CPM construction schedules in Primavera P6 and MS Project, so you can submit compliant baseline schedules with your bid.
Permit Drawings & Submittal Packages
Code-focused architectural and structural permit sets prepared to help commercial builders move through municipal plan review.
Demolition & Site Clearing Estimating
Quantities for structural demolition, interior gut-outs, and slab removal, so abatement and haul-off costs are forecast accurately.
Xactimate Insurance Estimating
Xactimate line-item estimates for fire, flood, storm, and property damage reconstruction, built to support claim approvals.
Subcontractor & Trade-Specific Material Takeoffs
Field-calibrated quantity takeoffs so trade subcontractors can order material, fabricate, and schedule crews with confidence.
Concrete & Masonry Takeoffs
Volumes for footings, grade beams, slabs, and retaining walls, plus rebar tonnage, wire mesh, and CMU counts with mortar deductions.
Structural Steel & Metal Detailing
Itemized beams, columns, and joists, with cut lists covering metal deck, shear tabs, base plates, and weld lengths.
Lumber Takeoff & Wood Framing
Stick-by-stick counts for studs, plates, headers, and rafters, with hardware counts your lumberyard can quote directly.
Drywall & Light-Gauge Framing
Wall-by-wall takeoffs for steel studs, track, channel, and board, plus acoustic ceilings, insulation, and finishing.
Roofing, Siding & Envelopes
Envelope quantities for shingle, metal, and TPO roofs, with pitch-adjusted squares, membranes, siding, and flashing.
MEP Estimating
Conduit, wire, panels, plumbing fixtures, mechanical equipment, and drainage lines, fully itemized by system.
Earthwork & Site Utility Takeoffs
Cut and fill, topsoil stripping, trench excavation, and underground storm and utility piping quantities.
Fire Protection & Sprinkler Estimating
Sprinkler head counts, risers, mains, branch lines, and backflow preventers, priced to the project’s fire protection drawings.
Shop Drawing & Fabrication Detailing
Submittal-ready ductwork, structural steel, and millwork shop drawings that fabrication shops can build from.
More Specialized Trade Takeoffs & Drafting Services
Free Estimating Calculators
Takeoff Standards & Deliverable Formats
What every estimate is built on, regardless of the trade.
Software Delivery Formats
Quantities delivered in PlanSwift, Bluebeam Revu markups, and structured Excel spreadsheets.
RSMeans Cost Parity
Labor rates, equipment costs, and material benchmarks calibrated to the project’s location in any of the 50 states.
Rapid Turnaround
Standard trade takeoffs delivered in 24 to 48 hours, leaving your estimating desk time to review before the bid.
Frequently Asked Questions
Direct answers about our estimating workflow, software formats, and deliverables.
Are Your Estimates Prepared by AI or Human Estimators?
Our estimates are prepared and reviewed by experienced human estimators. We use professional estimating software and technology to improve speed, accuracy, and efficiency, but the final quantities, costs, assumptions, and estimate are reviewed by a human estimator. This helps us provide project-specific estimates based on the drawings, specifications, materials, labor, and scope of work.
What exact deliverables are included with every material takeoff?
Every takeoff package includes an itemized Excel bill of materials organized by CSI MasterFormat, color-coded PlanSwift or Bluebeam markups showing every measured line, and a document listing takeoff assumptions, scope clarifications, and RFIs.
How are regional material and labor rates calculated for our project location?
Pricing is calibrated to your project’s zip code using RSMeans cost indices, then cross-checked against regional supplier pricing and local union, open-shop, or prevailing wage rates.
What is the typical turnaround for a bid-ready takeoff?
Standard trade takeoffs are delivered within 24 to 48 hours. Large full-scope commercial bids (CSI 02 to 33) typically take 3 to 5 business days depending on drawing complexity, and rush turnaround is available after plan review.
What drawing and blueprint formats do you accept?
We work with PDF plan sets, AutoCAD drawings (.DWG), and Revit models (.RVT / .IFC). Conceptual takeoffs can also be prepared from preliminary schematic sketches.
Can takeoffs be loaded into our company’s internal bidding templates?
Yes. Our estimators routinely populate client templates, mapping quantities and unit costs straight into your sheet so you don’t spend hours re-typing data.
How do you handle addenda or revised drawings issued before bid day?
Forward the new sheets as soon as they’re issued. We compare the revisions against the original set, adjust the affected line items, and reissue an updated markup summary before your bid deadline.
Send Your Plans for a Fast, Itemized Bid Quote