Electrical Estimating Services for US Contractors
Miscount one panel schedule or misread a feeder spec, and the bid is wrecked before the first conduit goes up. Our field-tested estimators check every line by hand and deliver in 24-48 hours.
Get a Free Quote- Prepared and reviewed by human estimators
- ASPE CPE-credentialed team
- Second-estimator check on every takeoff
- Marked-up drawings + editable Excel
- Most takeoffs in 24–48 hours
Built for subcontractors, general contractors and suppliers bidding work across the US. We don’t prepare estimates for homeowners.
- Who it is forElectrical contractors and GCs bidding electrical scope
- What you getA line-item takeoff with every conduit run, wire, device and fixture counted from the drawings
- Turnaround24–48 hours, checked by human estimators
Where Electrical Bids Lose Money
The Real Cost of a Rushed Conduit Count
An under-calculated electrical conduit takeoff linear feet matrix doesn't show up on paper — it shows up mid-pull, when your crew runs short on EMT halfway through a floor. Consequently, you're paying rush freight and eating labor hours waiting on material. Therefore, we treat every conduit run, bend, and stub-up as its own line item, not a rough average pulled off a floor plan.
Cross-Checking Against Division 26 Before You Bid
We check every switchgear and power sheet against the Division 26 specs before any number reaches your estimate. Design changes happen all the time on commercial jobs. This check keeps your bid solid when drawings change two weeks before award. Most software takeoffs never open the spec book.
Stabilizing Cash Flow With Accurate Material Numbers
An exact electrical material cost keeps cash flow steady on apartment and industrial jobs. Measuring branch circuits by hand catches shared-neutral runs and dedicated circuits that software flattens into one average. So contractors stop losing thousands on low-voltage work that was never counted right.

Our Electrical Estimating Scope
Every feeder poundage and linear foot of raceway logged manually. No automated averages—just flawless procurement data.
Power Distribution & Switchgear Systems
- Main switchboards and service entrance panel counts fully itemized
- Distribution panelboards tracked cleanly by voltage and pole configurations
- Step-down transformers logs, including dry-type and oil-filled profiles
- Variable frequency drives VFDs listed strictly by horsepower ratings
- Automatic transfer switches ATS with clear operational amperage breakdowns
- Structural disconnect switches tracked by fused and non-fused parameters
- Heavy bus duct runs measured precisely in linear feet
- Metering equipment configurations and CT cabinet counts
Conduits, Raceways & Feeders
- Electrical conduit takeoff linear feet, split by EMT, PVC, and rigid metal conduits
- Wireway assemblies broken down cleanly by structural size and material gauge
- Cable tray assembly linear metrics, separating ladder and solid-bottom layouts
- Heavy copper feeder cable poundage calculated accurately by AWG thickness sizes
- Compression couplings and connectors isolated by fitting type parameters
- Pull boxes and junction boxes quantified per NEC sizing requirements
- Raceway assemblies itemized carefully through fire-rated walls and floor penetrations
- Expansion fittings tracked explicitly across moving structural expansion joints
Lighting Systems & Branch Circuiting
- Interior lighting fixture counts isolated by type, code, and mounting descriptions
- Exterior lighting fixture counts, including pole-mounted and building-mounted units
- Occupancy and daylight sensor counts separated clearly by local zone codes
- Low-voltage master lighting control panel counts and relay grids
- Emergency and exit signal fixture counts matched to strict municipal codes
- Branch circuit wiring length calculator runs evaluated by home-run distances
- Duplex receptacle counts grouped cleanly by circuit phase assignments
- Dedicated equipment connection circuits calculated for mechanical and HVAC loads
Auxiliary, Low-Voltage & Grounding Systems
- Fire alarm device loops and initiating circuit node counts logs
- Data and telecom rack counts with integrated cable tray structural coordination
- Security access card reader and door position magnetic switch counts
- Lightning protection air terminals and down-conductor system runs
- Bare copper grounding grid linear footage tracking parameters
- Ground rod counts classified accurately by local soil resistance zones
- Field labor hour estimations mapped cleanly to NECA difficulty factors
- Bonding jumper counts itemized across dissimilar metal structural transitions
How We Estimate Conduit Runs
Conduit is where most electrical bids lose money: a run measured too short, a missing pull box or a coupling count left to a guess. This is the method our estimators follow on every set of drawings.
- Split branch from feederBranch conduit (usually 1/2" to 1") and feeders are taken off separately, because they carry different material, labor and pricing.
- Measure the real routingRuns are measured along the path the conduit will actually take, square to the building lines, not as a straight line between devices.
- Add every verticalDrops to switches and receptacles, rises to panels and stub-ups are added to each run from the ceiling height and mounting heights on the drawings.
- Price home runs on their ownHome runs are measured back to the panel and kept apart, as specs often call for a different raceway (for example EMT home runs with MC branch).
- Count runs, then fittingsEach run gets its terminations, couplings per stick, elbows, straps and supports, so fittings follow the length instead of a flat percentage.
- Check bends and pull pointsThe bends in each run are added up. Where a run passes 360 degrees between pull points, the extra pull box or conduit body is counted.
- Apply labor by conditionInstallation hours are set per 100 feet by type and size, then adjusted for height, exposed or concealed work, embedded or underground runs and access.
- Reconcile with Division 26Raceway types, minimum sizes and support methods are checked against the specs before the takeoff is priced.
Conduit installation estimating: what changes the hours
Two runs with the same length can carry very different labor. Our estimators apply labor units per 100 feet and adjust them for the conditions shown on the drawings.
| Factor | What we look at | Effect on the estimate |
|---|---|---|
| Raceway type | EMT, IMC, rigid (RMC), PVC Schedule 40/80, flexible and MC | Rigid and IMC need threading and are heavier, so they take more hours per foot than EMT |
| Trade size | 1/2" through 4" and larger | Larger sizes need more bending effort, heavier supports and larger fittings |
| Working height | Ceiling height, lifts and scaffolding | Work above standard ladder height adds time for access equipment |
| Installation method | Exposed, concealed in walls, embedded in slab, underground | Embedded and underground runs add trenching, spacers, sweeps and coordination with other trades |
| Bends and pull points | Number of 90s and offsets per run | More bends mean more field bending or factory elbows, and extra pull boxes past 360 degrees |
| Supports | Straps, strut, trapeze hangers and seismic bracing | Support spacing and type follow the NEC article for that raceway and the project specs |
| Site conditions | Occupied buildings, remodel, hazardous or wet locations | Restricted access and special fittings lower productivity |
Dynamic raceway fitting adjustment: try it on your own runs
Fittings should move with the run, not sit as a fixed percentage. This tool adjusts couplings, terminations, elbows, supports and pull points as you change the conduit type, size, length and bends of each run.
0 sticks
| Couplings | 0 |
| Connectors / terminal adapters | 0 |
| Factory 90° elbows | 0 |
| Factory 45° elbows | 0 |
| Field bends | 0 |
| Straps / supports | 0 |
| Extra pull points (over 360°) | 0 |
| Raceway | Net LF | Order LF |
|---|
Support spacing: EMT, IMC and RMC at 10 ft; PVC by size (1/2"-1" 3 ft, 1-1/4"-2" 5 ft, 2-1/2"-3" 6 ft, 3-1/2"-5" 7 ft), plus one support within 3 ft of each termination. One extra coupling is counted per factory elbow. Pull points follow the 360° limit between pull points. Material counts only: labor hours, boxes, wire, cost and project-specific spec rules are not included, so check against the drawings, specs and the NEC edition adopted for your project.
Need a full conduit and wire takeoff? Get a Free Quote →Low Voltage Estimating Services
Low voltage scopes are often bid by a different contractor, so we can price them inside your electrical estimate or as a separate package with its own device counts, cable lengths and pathways.
| System | What we count and measure |
|---|---|
| Fire alarm | Panels, power supplies, initiating and notification devices, modules, SLC and NAC cable, backboxes and pathways |
| Structured cabling (voice/data) | Outlets and drops, Cat 6/6A and fiber lengths, patch panels, racks, cable tray, J-hooks and sleeves |
| Security and access control | Card readers, door contacts, REX devices, locking hardware power, controllers and composite cable |
| CCTV / video surveillance | Cameras by type, mounts, NVR and storage, PoE switch ports and cable runs |
| Nurse call and intercom | Stations, dome lights, pull cords, master stations and system cabling |
| Audio visual | Displays, speakers, amplifiers, floor and wall boxes, and AV cable |
| Lighting controls | Occupancy and daylight sensors, dimmers, control panels, relays and low voltage control wiring |
| DAS and emergency responder radio | Antennas, splitters, coax lengths and head-end equipment where shown |
Interior & Project Estimates
From a single tenant fit-out to a full new building, the estimate is built around how the electrical work is bid and installed on that project type.
| Project type | What the estimate focuses on |
|---|---|
| Interior fit-out and tenant improvement | Branch circuits, lighting and devices, panel changes, demolition and make-safe work, and tie-ins to existing systems |
| Commercial new construction | Service and distribution, feeders, branch, lighting, devices, low voltage pathways and temporary power |
| Industrial and manufacturing | Motor feeds, MCCs, VFDs, cable tray, rigid conduit, controls and hazardous location fittings |
| Healthcare and education | Essential electrical systems, emergency branches, nurse call, fire alarm and phased construction |
| Apartment and residential | Unit-by-unit device and lighting counts, meter centers, feeders and common-area systems |
| Data centers and mission critical | Switchgear, UPS and PDU feeds, busway, generators, grounding and redundant pathways |
Manual Takeoffs vs. Software
Automated push-button tools operate on flat pixels. They do not know a riser jogs behind a shaft wall, miss low-voltage details, and ignore drops. Consequently, software shortcuts leave you exposed to major procurement deficits.
| Electrical Segment | Automated Push-Button Software Limit | Design Estimation Manual Expert Solution |
|---|---|---|
| Multi-Story Vertical Riser Transitions | Auto-scaling tools measure straight-line distance on a single flat plane, completely shortchanging vertical elevation path feet. Missed Feeder Runs | We trace the riser sheet floor by floor and add vertical drops and elbows to the conduit footage. Accurate Feeder Buying |
| Complex Low-Voltage Controls Integration | Control schematics on separate pages get skipped entirely because they sit outside the standard power layouts the software scans. Skipped Terminal Pins | Our estimators cross-reference the auxiliary controls sheet against panel schedules by hand, capturing every control conductor. Airtight Auxiliary Pricing |
| Overloaded Shared Neutral Conduit Runs | Shared neutral configurations get averaged into a generic multiplier, completely missing conduit fill derating bottlenecks. Failed Field Inspections | We calculate conduit fill manually against NEC derating tables, flagging any run at risk of exceeding fill or ampacity limits before bid day. Flawless NEC Compliance |
Electricians' Bidding Software vs. an Expert Takeoff
Electricians' bidding software, such as Accubid, McCormick or ConEst, is used by many US electrical contractors to apply labor units, price material and build the final proposal. But the bid is only as good as the quantities fed into it. If conduit runs, wire lengths or device counts are missed at the takeoff stage, the same mistake is carried straight into the bid. That is where our estimators come in: every run and device is counted by hand from the drawings and checked against the Division 26 specs, and the takeoff is delivered in editable Excel so it can be loaded into the electrical bidding software already used in your shop.
So what is the best estimating software for electrical contractors? No single answer fits every shop. Accubid and McCormick are often chosen by mid-size and large commercial contractors, while ConEst and simpler cloud tools are picked by smaller residential and service electricians. The right choice is usually decided by job size, the labor unit database you trust, and how much time can be spent on setup and training. Whichever tool is picked, the counts going into it still have to be right, and that part can be handed to our team.

Our 4-Step Estimating Process
Complete Blueprint & Project Manual Onboarding
We pull in the full drawing set, project manual, and spec book before a single count begins. Specifically, we isolate the division 26 electrical equipment specs to establish our core checklist.
Electrical System Trade Review & Assignment
Your scope gets split across power distribution, raceways, lighting, and low-voltage — each assigned to an estimator with matching trade depth so field challenges are met seamlessly.
Line-by-Line Manual Run & Count Quantification
Every conduit run, fixture count, and feeder length is measured and logged sheet by sheet. Consequently, our manual branch circuit wiring length calculator captures real physical space attributes.
Senior QA Sign-Off & Editable Excel Delivery
A second senior estimator checks the whole takeoff against the panel schedules. Then we send an unlocked Excel bill of materials (BOM) you can edit, set up for your buying system.
Ready To Get Started?
Send your drawings and bid date today, and we'll confirm scope, price, and delivery time.
Electrical Guides
Practical guides from our estimators on the topics contractors ask about most.
Electrical Takeoff and Labor Cost Estimating
How Electrical Quantities Are Calculated From Drawings
Devices, fixtures and equipment are counted from the power, lighting and systems plans. Conduit and wire are measured run by run from panel to device, with vertical drops added, and panel schedules and the one-line diagram are used to size feeders.
What an Electrical Material Takeoff Includes
An electrical material takeoff lists gear and panels, transformers, lighting fixtures, devices, conduit and fittings by size, wire and cable by gauge, boxes, supports, grounding and low-voltage systems, all organized by system in an editable Excel file.
How Electrical Labor Costs Are Calculated
Labor is priced from the takeoff using labor units per device, foot of conduit and foot of wire, adjusted for installation height, wall type and job conditions. The total hours are then multiplied by the local crew rate to reach the labor cost.
How Conduit and Wiring Quantities Are Estimated
Conduit is measured by size and type for each run, including bends and stub-ups. Wire is calculated from the conduit length times the number of conductors, plus extra for terminations, so the wire order matches the field.
Before You Hire an Estimator
The three questions contractors ask most before they send plans to an outside team.
Can I check your numbers?
Every takeoff comes with color-coded marked-up drawings and an editable Excel sheet, and it is checked by a second estimator before it is sent.
What if drawings change before bid day?
Send the addendum or the clouded sheets. Only the affected quantities are updated, and the changes are marked.
Will the price change later?
A free fixed quote is sent after your plans are reviewed and before any work starts. The quoted price is the price you pay.
Electrical Estimating FAQs
Answers to the questions contractors ask most before sending us their plans.
Are Electrical Estimates Prepared by AI or Human Estimators?
Our electrical estimates are prepared and reviewed by experienced human estimators. We use professional estimating software to support quantity calculations and improve efficiency, while our estimators review drawings, specs, materials, labor, and project requirements before finalizing the estimate.
Will your electrical takeoff fit my own bid template?
Yes. A blank template or a past bid can be sent to us. The quantities are filled into your own columns, line items and cost codes, so the takeoff drops straight into your pricing.
How accurate is your electrical takeoff for conduit and wire?
Our hand checks keep accuracy above 98% (measured as quantity variance within ±2% of final awarded or as-built quantities on reviewed jobs). We check every conduit and feeder count against the drawing notes by hand. That catches riser changes and derating factors that cause shortages mid-pull.
What does a commercial electrical estimate include?
You get a detailed Excel sheet, item by item, split by system. Specifically, it details conduit runs by EMT/PVC, feeder cable poundage, switchgear power distribution sheets, lighting fixture counts, and low-voltage counts with plan ID tags.
How do you estimate low-voltage wiring and circuiting?
Our estimators cross-check low-voltage controls schematics against matching panel schedules by hand. So every low-voltage wire and device is counted long before you buy or detail.
How do you estimate conduit runs on electrical drawings?
We measure each run along its real routing, then add the verticals. Branch and feeder conduit are taken off separately, home runs are measured back to the panel, and drops and rises are added from the ceiling and mounting heights. Couplings, terminations, elbows, supports and pull points are then counted per run from its length and bends.
How is conduit installation labor estimated?
Labor is set in hours per 100 feet for each raceway type and size, then adjusted for the job. Our estimators adjust for working height, exposed or concealed work, embedded or underground installation, the number of bends, support type and site access, and show the hours separately in the Excel file.
Do you offer low voltage estimating services on their own?
Yes. Fire alarm, structured cabling, access control, CCTV, nurse call, AV, lighting controls and DAS can be priced as a separate low voltage package or included in your electrical estimate, with device counts, cable lengths and pathways listed by system.
Do you estimate interior electrical and tenant improvement projects?
Yes. For interior fit-outs we count branch circuits, lighting, devices, panel changes, demolition and make-safe work, and the tie-ins to existing systems, delivered in 24-48 hours like our new construction estimates.
Can electrical estimating services prepare bid-ready estimates?
Yes. We deliver bid-ready electrical estimates with quantities, material prices and labor hours by system, in an editable Excel file, typically in 24 to 48 hours. You add your own markup and submit.
Do you provide electrical takeoffs for electrical contractors?
Yes. Conduit, wire by size, fixtures, devices and gear are counted by area and delivered in an editable Excel sheet, usually within 24 to 48 hours.
Need integrated utility or architectural framing analysis on the same structural footprint? Review our targeted MEP Estimating Services panel.
More Trade Estimating Services
Need another trade priced on the same project? The same team covers it.
Priced for Where You Build
Material prices and labor rates change from one market to the next, and we price each job for its location.
Protect Your Electrical Bids
Upload your full electrical plan set now and receive an editable, field-ready Excel breakdown within 24-48 hours safely.
