BIM Modeling & VDC Coordination Services
Submittal-ready Revit models and Navisworks coordination sets for general contractors, engineering firms, and MEP subcontractors, so trade conflicts are solved on screen instead of in the ceiling.
Get a Free BIM ProposalConstructible Models That Catch Clashes Before the Crew Does
BIM modeling services from Design Estimation build Autodesk Revit models from LOD 100 to LOD 500 and run Navisworks clash coordination for architectural, structural, and MEP trades. Initial federated models and clash reports for mid-sized commercial projects are usually delivered within 4 to 6 business days, with native RVT, NWD, IFC, and PDF files.
- Who it is for: general contractors, engineering firms, and MEP subcontractors running coordination or prefabrication.
- What we model: MEP, structural steel and concrete, architectural, 4D phasing, 5D quantities, and scan to BIM.
- Standards: AIA and BIMForum LOD definitions, matched to your BIM execution plan.

The Ceiling Everyone Wants
Walk any commercial job during rough-in and you'll find it: a duct main, a sprinkler line, a cable tray, and a sanitary pipe all trying to occupy the same 18 inches above the ceiling grid. On 2D drawings it looked fine. In the field, somebody has to cut, reroute, or wait.
Every one of those conflicts becomes an RFI, a change order, or a crew standing around. Multiply that across every floor and the schedule starts slipping before the drywall goes up.
Our BIM modeling services move that fight onto the screen. We model each trade to the agreed LOD, run clash detection in Navisworks, and resolve the conflicts with your subs before anything gets fabricated or hung.
Why Contractors Use Our BIM Team
Models built by people who understand how it goes together.
LOD 100 to LOD 500Modeled to the depth your phase actually needs
Clash Detection That Filters NoiseCustom search sets and tolerances in Navisworks
Coordination MeetingsWe can lead weekly clash reviews with your subs
5D Quantities From the ModelTakeoffs that follow every design revision
Comprehensive VDC & BIM Modeling Solutions
Design drawings often lack spatial coordination. Our VDC workflow turns design intent into constructible, data-rich models your trades can build from.
MEP BIM
Parametric duct, pipe, conduit, and tray models in Revit that account for slope, insulation thickness, and hangers, so subs can install without field modifications.
Structural Steel & Concrete BIM
Structural models up to LOD 400 with rebar clearances, anchor bolt locations, and steel connections, so fabricators can verify embeds before the pour.
Architectural BIM & Envelopes
Parametric Revit families for walls, glazing, and envelope assemblies with tight dimensional control, so submittals move through architect review with fewer redlines.
4D Phasing & Simulation
Schedule activities linked to the 3D model to show crane reach, laydown areas, and pour sequences, so congestion shows up before crews mobilize.
5D Takeoffs & Estimating
Quantities for concrete, steel, and ductwork pulled from model schedules and tied to our estimating workflow, so takeoffs follow each design revision.
Scan to BIM
Laser scan point clouds (E57, ReCap) converted into Revit models of existing buildings, so renovation crews don't find hidden structure or utilities the hard way.
Navisworks Clash Resolution Matrix
We don't just run an automated report and send it over. Each clash type gets reviewed and resolved with the trades involved.
Hard Clashes
Two components in the same physical space, like an 18-inch supply duct running through a steel beam. We adjust elevations and offsets to clear them before fabrication.
Soft / Clearance Clashes
Violations of required service, access, or code clearances around equipment, valves, and electrical gear. We set up service zones so those buffers stay open.
Workflow / 4D Clashes
Sequencing conflicts where one trade's work blocks another. Resolving them early prevents jobsite downtime and stacking problems between subs.
LOD Delivery Matrix
Choose the depth of modeling detail your preconstruction, coordination, or fabrication phase actually needs. See our guide to BIM LOD 100 to 500 for more.
| Phase | Geometric Detail | Data Depth | Typical Use |
|---|---|---|---|
| ConceptLOD 100 | Massing, overall volume, and orientation | Rough areas, boundaries, and height limits | Feasibility, zoning review, conceptual cost |
| SchematicLOD 200 | Generic assemblies with approximate size and location | System types and general material layers | Early approvals, space planning, baseline MEP sizing |
| DetailedLOD 300 | Specific assemblies with precise dimensions and locations | Materials, equipment tags, and design parameters | Permit submittals and bid takeoffs |
| CoordinatedLOD 350 | Connections, supports, and clearances between systems | Anchors, brackets, and support framing | Multi-trade clash resolution and install planning |
| FabricationLOD 400 | Fabrication-ready geometry with manufacturer parts | Assembly data, cut parameters, and spool dimensions | Off-site prefabrication and shop manufacturing |
| As-BuiltLOD 500 | Field-verified conditions after installation | COBie data, serial numbers, and maintenance info | Facility management and asset tracking |
Software Stack & Export Formats
We work inside your existing common data environment and deliver in the formats your team already uses.
Core BIM Modeling
Fabrication & Detailing
Open BIM
Deliverables

Clear Steps. Coordinated Models. Signed Off.
Four steps from design handover to a coordinated model your trades have agreed on.
Here's How We Coordinate Your Project:
Model Intake & Audit
We bring architectural, structural, and equipment data into one Revit workspace with confirmed shared coordinates.
Trade Modeling
Each trade is modeled to the agreed LOD, including insulation, hangers, and required clearances.
Navisworks Clash Audit
Hard and soft clash runs flag conflicts, with practical reroute options for the trades to approve.
Sign-Off & Extraction
We publish the coordinated federated model, shop sheets, and spool drawings for field use.
Ready To Get Started?
Send your drawings, models, or scan data today, and we'll reply with a BIM scope and schedule.
From Coordinated Model to Shop Floor
Coordinated models turn into shop-level submittals and drawings through our drafting team.
Quantities and Schedules From the Same Model
Use the model for 5D BIM cost estimation, 4D phasing, and location-based pricing in California, Texas, or Florida.
BIM Guides
Start with our complete guide, then go deeper on the topics contractors ask about most.
BIM Services: Common Questions
Answers to the questions contractors and design firms ask before outsourcing BIM.
Are BIM Models Prepared by AI or Human Modelers?
Our BIM models are prepared and reviewed by experienced human BIM modelers. We use professional BIM software to work efficiently, while our modelers review drawings, specifications, coordination issues, and project requirements before delivering the model.
What is the difference between standard CAD drafting and BIM services?
CAD produces 2D lines that show dimensions without embedded data. BIM builds parametric 3D models with real material properties, model numbers, and quantities. When an element changes in BIM, every related plan, section, and schedule updates with it.
Can you lead weekly multi-trade coordination meetings with our subcontractors?
Yes. Our VDC team can act as lead BIM coordinator for your project, running weekly online clash meetings, presenting Navisworks viewpoints, and assigning resolution tasks to each trade until the federated model is signed off.
What files do you need from us to begin modeling?
Architectural, structural, and MEP drawings in PDF or DWG are enough to start. Equipment cut sheets, specifications, and any existing Revit files help us build a stronger coordination baseline.
How do you prevent hundreds of false-positive clashes in Navisworks?
We build custom search sets and tolerance rules in Navisworks Manage instead of running every model against every other. That filters out the noise so your trades focus on real structural penetrations and crossovers.
Can you extract quantity takeoffs directly from the Revit model?
Yes. Because walls, ducts, and footings are modeled to dimension, our estimators pull quantities from model schedules for procurement and bidding. See our guide to 5D BIM cost estimation for how it works.
What is your typical turnaround time for an initial clash report?
For mid-sized commercial projects, we usually deliver the initial federated model and preliminary clash report within 4 to 6 business days. Expedited milestones are available for urgent deadlines.
Do you provide MEP BIM modeling services for subcontractors?
Yes. We build Revit MEP models for HVAC ductwork, piping, plumbing, electrical and fire protection, typically at LOD 350 for coordination and LOD 400 for fabrication. Mechanical, plumbing and electrical subcontractors use our models for clash resolution, spool drawings and prefabrication.
Do you offer scan to BIM and point cloud modeling services?
Yes. We convert laser scan point clouds, such as E57 or ReCap files, into Revit models of existing buildings at the level of development your renovation or as-built project needs. The model shows walls, structure, MEP and equipment as they actually exist on site.
Can we outsource BIM modeling for a single project or trade?
Yes. Contractors and design firms outsource BIM to us for one project, one trade, or ongoing overflow work. You receive native Revit files, Navisworks coordination models and drawings set up to your standards, and you keep full ownership of the models.
Do you provide architectural and structural BIM services?
Yes. We model architectural Revit sets from design development to construction documents, and structural steel, concrete and rebar models for coordination and detailing. See our guide to BIM LOD 100 to 500 for what each level of detail includes.
Solve Jobsite Clashes Before You Break Ground
Send your drawings, trade specs, or scan data today. We'll reply with a VDC proposal and schedule, usually within 4 hours.
