Sitework and Earthwork Estimating Services
Miss the stripping depth on swelling clay or get trench backfill wrong, and a civil job's margin is gone before the first cut. Our Earthwork and Sitework Estimating Services check every cut and fill quantity by hand, line by line, without relying on auto-scaling software.
Get a Free Quote- Prepared and reviewed by human estimators
- ASPE CPE-credentialed team
- Second-estimator check on every takeoff
- Marked-up drawings + editable Excel
- Most takeoffs in 24–48 hours
Built for subcontractors, general contractors and suppliers bidding work across the US. We don’t prepare estimates for homeowners.
- Who it is forSite and earthwork contractors and GCs
- What you getDivision 31–33 quantities: cut and fill, grading, utilities and paving, ready to price
- Turnaround24–48 hours, checked by human estimators
Where Sitework Bids Lose Money
What Happens When Cut & Fill Numbers Go Wrong
An under-calculated cut and fill civil calculation cubic yards matrix is a jobsite nightmare. Crews run short on trench backfill mid-excavation, haul-off trucks sit idle waiting on revised import numbers, and change orders start eating the bid margin before rough grading is even complete. For instance, a missed swell factor on swelling clay can turn a "balanced site" into a six-figure import problem. Therefore, the estimate has to be right before mobilization, not adjusted after the dozers are already on-site.
Why Manual Cross-Verification Matters on Complex Topography
Real ground rarely matches a clean digital model. So we check the Division 31 earthwork specs by hand against contours, boring logs and existing utilities. Software flattens these into averages. Hand-checked bids hold up to RFIs. Software-only bids get exposed the moment a super walks the real grade.
How Precise Tracking Prevents Hauling Overruns
An exact log of clearing and soil stabilization costs, plus a hand takeoff of dig depths, stops contractors from losing thousands on hauling overruns. Every strip depth, haul route and stabilization zone is logged before bid day — not discovered during it.

Our Sitework Takeoff Scope
Every mass grading elevation and structural excavation profile mapped out cleanly. No general volumetric scaling—just precise manual tracking loops.
Site Prep, Clearing & Stabilization
- Land clearing and soil stabilization costs logs itemized completely by vegetative density
- Stripping depth factors mapped out zone-by-zone according to topsoil boring reports
- Grubbing acreage tracking parameters isolated cleanly for mechanical equipment clearing runs
- Geotextile fabric square yards and stabilization mesh alignment metrics mapped out safely
- Dynamic compaction zones and heavy subbase rolling hour estimates isolated
- Erosion control silt fences linear footage and temporary runoff barriers calculated
How do you price an excavation job?
Excavation is priced from bank cubic yards measured on the plans. Swell is added for hauling, a production rate is set for each machine, and equipment, operator, trucking and disposal costs are applied to get a cost per cubic yard, before mobilization, overhead and profit are added.
What drives commercial excavation cost?
Cut and fill volumes, soil type, depth, haul distance and site access. We measure cut, fill and trench volumes from the grading and utility plans, so you can apply your own production rates and trucking costs.
Excavation, Grading & Mass Earthwork
- Cut and fill civil calculation cubic yards layout detailed across entire topography grid grids
- Mass grading grids cross-checked room-by-room against finish subgrade profiles
- Subgrade preparation areas mapped cleanly for structural foundations and slab structures
- Structural fill import quantities tracking to stabilize un-compacted native site conditions
- Retention pond volume calculations including side slopes and overflow containment specs
- Soil swell/shrinkage factor adjusts applied precisely by native moisture testing limits
Underground Utilities & Trenching
- Underground utility pipe linear footage logs segregated precisely by individual diameter ranges
- Trench backfill volumes and structural native replacement yardage loops tracked safely
- Manhole structural counts, catch basin connections, and drops logged cleanly
- Sewer/stormwater runoff runs measured with slope gradient invert drops
- Gravel bedding yardage logs calculated room-by-room for pipe foundation safety
Finish Sitework & Paving Subgrades
- Subbase gravel course volume tracking isolated cleanly for heavy parking lot layouts
- Asphalt square footage counts split beautifully by surface course thickness
- Concrete curb and gutter linear footage runs mapped out with expansion joints
- Concrete sidewalk base preparation work evaluated room-by-room across subgrades
- Topsoil placement square yards calculated cleanly for final stabilization and landscaping
What Is Sitework in Construction?
Sitework is everything done to the land before and around a building: clearing, grading, excavation, underground utilities, paving and landscaping. It is the first scope on site and one of the easiest to misprice.
Sitework (also called civil sitework or civil earthwork) is the work that prepares a site for construction and finishes the ground around it. In CSI MasterFormat it is split across Division 31 Earthwork, Division 32 Exterior Improvements and Division 33 Utilities.
What Is Division 31 in Construction?
Division 31 Earthwork covers moving, shaping and supporting soil. These are its main sections and what our estimators take off for each:
| Section | Covers | What we count |
|---|---|---|
| 31 10 00 Site Clearing | Clearing, grubbing, tree removal, topsoil stripping | Acres cleared, trees by size, topsoil CY stripped and stockpiled |
| 31 20 00 Earth Moving | Excavation, fill, grading, trenching, backfill | Cut and fill CY, import or export, trench LF and CY, compaction |
| 31 30 00 Earthwork Methods | Soil stabilization, lime or cement treatment, geotextiles | SY of treated subgrade, tons of additive, SY of fabric |
| 31 40 00 Shoring and Underpinning | Shoring of existing structures | Shoring by area or location, as detailed |
| 31 50 00 Excavation Support | Sheet piling, soldier piles and lagging, trench boxes | SF of support, piles by length, dewatering |
| 31 60 00 Special Foundations | Driven piles, drilled piers, caissons | Piles and piers by count, diameter and length |
What's Included in Commercial Sitework Services?
| Division | Commercial sitework scope |
|---|---|
| Division 31 Earthwork | Clearing, demolition of site features, topsoil stripping, mass grading, building pad prep, excavation and backfill, erosion and sediment control |
| Division 32 Exterior Improvements | Aggregate base, asphalt and concrete paving, curb and gutter, sidewalks, striping, fencing, retaining walls, landscaping and irrigation |
| Division 33 Utilities | Water mains and services, sanitary sewer, storm drainage, manholes, catch basins, detention, gas and electrical duct banks |
See how these scopes are priced in our excavation cost estimator guide and asphalt paving cost guide.
How We Calculate Earthwork
Our grading and excavation estimating services turn existing and proposed surfaces into cut, fill, import, export and truckload numbers you can bid with.
| Method | When we use it |
|---|---|
| Surface comparison (TIN or grid) | Mass grading from CAD surfaces or contour plans; the most accurate for whole sites |
| Average end area | Linear work such as roads, channels and long trenches, using cross sections |
| Grid or borrow-pit method | Pads and lots where spot elevations are given on a grid |
| Prismoidal formula | Irregular sections where average end area would overstate volume |
Swell and shrink: bank, loose and compacted yards
Soil changes volume as it is dug and compacted. A cubic yard in the ground (bank) becomes more than a yard in the truck (loose) and less than a yard once compacted. Typical factors, which we replace with the soil report values when available:
| Material | Swell (bank to loose) | Shrink (bank to compacted) |
|---|---|---|
| Sand and gravel | 10 to 15% | 5 to 10% |
| Common earth (loam) | 20 to 30% | 10 to 15% |
| Clay | 30 to 40% | 10 to 20% |
| Blasted rock | 50 to 65% | Compacts larger than bank (about +25 to 35%) |
Earthwork cut and fill calculator
Add your cut and fill areas to estimate bank, loose and compacted yards, net import or export and truckloads. For the full method, see our cut and fill calculation guide.
Balanced site
| Cut (bank CY) | 0 |
| Cut hauled (loose CY) | 0 |
| Fill required (compacted CY) | 0 |
| Bank CY needed for fill | 0 |
| Truckloads to import or export | 0 |
Volume = length × width × average depth ÷ 27. Fill needs bank CY = compacted CY ÷ (1 − shrink). Hauled material = bank CY × (1 + swell). Factors are typical values; use the soil report for your site. Material quantities only: topsoil, extra digging, unsuitable soils, haul distance and cost are not included.
Need a full sitework takeoff? Get a Free Quote →Dirt Estimating and Site Work Takeoffs
Dirt estimating is the part of site work estimating that prices the soil itself: how many cubic yards are dug, moved, hauled off, brought in and compacted. Whether your bid calls it dirt work, site work or sitework, the numbers come from the same takeoff.
| Dirt work item | What we count | Unit |
|---|---|---|
| Topsoil stripping | Stripped area times depth, plus stockpile volume for respreading | SF, CY |
| Mass excavation (cut) | Bank volume from existing vs. proposed surfaces | BCY |
| Structural fill and embankment | Compacted volume, with shrink applied to find the bank yards needed | CCY, BCY |
| Import dirt | Fill shortfall converted to loose yards and truckloads | LCY, loads |
| Export and haul-off | Surplus cut and spoils, with swell applied | LCY, loads |
| Trench excavation and backfill | Trench volume by pipe run, less pipe and bedding, plus select backfill | LF, CY |
| Fine grading | Finished areas under pavement, slabs, sidewalks and lawn | SF, SY |
How to estimate dirt hauling in truckloads
Truckloads = bank cubic yards x (1 + swell %) / truck capacity in loose yards. For example, 2,400 bank yards of common earth at 25% swell becomes 3,000 loose yards. A 12 CY tandem dump truck needs 250 loads to move it.
The dirt price follows from the loads: trucking per load or per hour, dump or tipping fees for export, and the purchase price of import fill. We list each one on its own line in the Excel estimate so you can plug in your local rates. Try the numbers on your own site with the earthwork cut and fill calculator above.
Manual Takeoffs vs. Software
Automated pixel extraction fails the moment a site has dynamic topographical configurations, complex slope transitions, or shifting soil strata. Because these tools read a flat digital surface instead of the physical ground truth, they miss the exact conditions that determine whether a bid survives or bleeds money in the field.
| Topographical Site Condition | Automated Push-Button Software Limit | Design Estimation Manual Expert Solution |
|---|---|---|
| Stepped Grade Transitions | Auto-scaling tools average elevation change across a slope, smoothing out benched transitions into a single grade line. Inaccurate Cut Estimations | A manual estimator reads each bench and riser individually, capturing true cut and fill volume at every transition point. 100% Solid Volume Metrics |
| Underground Bedding Mismatches | Push-button takeoffs assume uniform bedding depth across all pipe runs, completely ignoring utility conflicts. Pipe Backfill Shortages | Manual cross-checking against boring logs adjusts bedding and trench backfill volumes pipe-by-pipe based on subsurface realities. Perfect Trench Allocations |
| Stripping Depth Deviations | Generic software applies one flat stripping depth across the entire digital blueprint parcel. Under-stripping Penalties Risk | A precise sitework excavation depth takeoff varies strip depth by zone, tracking organic layers independently across metrics. Flawless Subgrade Strategy |

Our 4-Step Estimating Process
Complete Topography & Soil Report Onboarding
First, we collect your survey, boring logs, addenda, and civil drawings to establish true site conditions before any structural quantity work begins safely.
Civil Grading & Utility Review & Assignment
Next, a senior estimator reviews grading plans and underground utility layouts, flagging utility line conflicts and complex slope zones for manual processing loops.
Line-by-Line 3D Surface & Cut/Fill Quantification
Then we measure every cubic yard, linear foot and square foot by hand against the 3D surface, zone by zone.
Senior QA Sign-Off & Editable Excel BOM Delivery
Finally, a second senior estimator reviews the whole takeoff. Then we send an unlocked Excel bill of materials (BOM) you can edit, with clearing and stabilization costs, ready for bid day.
Ready To Get Started?
Send your drawings and bid date today, and we'll confirm scope, price, and delivery time.
Sitework Estimating Guides
Start with our earthwork takeoff guide, then go deeper on the topics contractors ask about most.
- Excavation Production Rates: How to Price Equipment by the Cubic Yard
- Cut and Fill Calculation: How to Estimate Earthwork Volumes
- Excavation Cost Estimator: A Guide for US Sitework Contractors
- Gravel Yardage Calculator: How to Calculate Gravel for Any Job
- Asphalt Paving Cost Calculator: Contractor Paving Guide
- Solar Farm Earthwork Estimation and Takeoff
- Site Work Estimating Sample (PDF)
Before You Hire an Estimator
The three questions contractors ask most before they send plans to an outside team.
Can I check your numbers?
Every takeoff comes with color-coded marked-up drawings and an editable Excel sheet, and it is checked by a second estimator before it is sent.
What if drawings change before bid day?
Send the addendum or the clouded sheets. Only the affected quantities are updated, and the changes are marked.
Will the price change later?
A free fixed quote is sent after your plans are reviewed and before any work starts. The quoted price is the price you pay.
Sitework Estimating FAQs
Answers to the questions contractors ask most before sending us their plans.
Are Earthwork & Sitework Estimates Prepared by AI or Human Estimators?
Our earthwork and sitework estimates are prepared and reviewed by experienced human estimators. We use professional estimating software to support quantity calculations and improve efficiency, while our estimators review drawings, specs, materials, labor, and project requirements before finalizing the estimate.
We can't bid every site job. Can you take on the overflow?
Yes. Site jobs can be sent to us one project at a time. Most takeoffs are delivered in 24 to 48 hours, and a firm delivery date is given with the quote. Larger sites may take longer, and you are told up front.
How do you account for soil swell and shrinkage in an earthwork estimate?
Our earthwork takeoffs run at 98%+ accuracy (within ±2% of final or as-built quantities on reviewed jobs), because we check every cut and fill quantity by hand against the boring logs and soil reports. We apply swell and shrink factors for each soil type and moisture level, not one flat average, which keeps hauling numbers accurate.
What does an underground utility takeoff include?
Our logs include underground utility pipe linear footage by diameter, trench backfill volumes, manhole structural counts, gravel bedding yardage, and sewer/stormwater runoff runs. Each metric is tracked separately so change orders on utility scope don't blow up your original bid.
How do you estimate topsoil stripping?
We set stripping depth zone by zone based on topsoil quality, organic content and grubbing area, not one depth for the whole site. That saves topsoil for reuse where possible and avoids under-stripping problems at final grading inspection.
What is sitework in construction?
Sitework is the work that prepares a site for a building and finishes the ground around it: clearing, grading, excavation and backfill, underground utilities, paving, curbs, fencing and landscaping. In CSI MasterFormat it falls under Divisions 31, 32 and 33.
What is included in commercial sitework services?
Commercial sitework usually includes Division 31 earthwork, Division 32 exterior improvements and Division 33 utilities: clearing, mass grading, building pad prep, erosion control, aggregate base and paving, curb and gutter, sidewalks, retaining walls, and water, sewer and storm lines.
How do you calculate earthwork volumes for an estimate?
We compare existing and proposed surfaces to get cut and fill in bank cubic yards, then apply swell and shrink factors to get hauled (loose) and compacted yards, net import or export and truckloads. Linear work such as roads and trenches uses the average end area method.
Do you provide grading and excavation estimates on their own?
Yes. We price grading, excavation, trenching or site utilities as a standalone package, or as part of a full sitework estimate, delivered in Excel with marked-up plans in 24-48 hours.
What is dirt estimating?
Dirt estimating is pricing the soil side of a site work bid. It covers topsoil stripping, cut, fill, import, export, trench backfill and fine grading in cubic yards, then converts the haul into truckloads, dump fees and import fill costs.
What construction estimating software do you use for excavation?
Digital earthwork and takeoff tools are used to build surfaces and measure cut, fill and trench volumes. Every volume is then checked by a human estimator against the soil report, swell and shrink factors and site access before pricing.
More Trade Estimating Services
Need another trade priced on the same project? The same team covers it.
Priced for Where You Build
Material prices and labor rates change from one market to the next, and we price each job for its location.
Protect Your Sitework Bids
Send us your civil survey files and boring logs today to receive a field-ready, waste-calibrated sitework takeoff in 24-48 hours safely.