How to estimate as a subcontractor comes down to one rule: price the job you will actually build, not the job you see at a glance. Subs lose more money on missed scope and wrong labor assumptions than on material prices. This guide walks through the estimate step by step, with a worked example and the mistakes that cost subcontractors the most.
How this guide was prepared: written and reviewed by the Design Estimation estimating team, led by founder Austin Smith (7+ years in construction estimating) and backed by ASPE Certified Professional Estimators. Contract rules and rates vary by state and project.
Step-by-Step Subcontractor Estimate
- Read the bid documents: your trade’s specification sections, Division 01 general requirements, the bid form and every addendum.
- Take off quantities: measure and count everything in your scope, by area, floor or system.
- Add waste separately: keep net quantities and waste on different lines so both can be checked.
- Price materials: use dated supplier quotes, and include delivery, tax and escalation.
- Calculate labor: quantity divided by your production rate gives crew hours; multiply by your burdened labor rate.
- Add equipment: lifts, scaffolding, rentals, fuel and mobilization.
- Add lower-tier subs: any work you subcontract, with scope leveled.
- Add overhead, profit and contingency.
- Write the bid: inclusions, exclusions, qualifications, alternates and unit prices.
Fill in your details and we’ll get back to you with a quote.
- Quote reply within 1 hour
- Estimates in 24–48 hours
- Prepared by human estimators
Worked Example: Pricing One Line of a Drawing Takeoff
The method is the same for every trade. Here it is with example rates; replace them with your own.
| Step | Calculation (example rates) | Result |
|---|---|---|
| Net quantity | From the takeoff | 10,000 sq ft |
| Waste | +10% | 11,000 sq ft |
| Material | 11,000 × $0.60 per sq ft | $6,600 |
| Labor hours | 10,000 ÷ 40 sq ft per hour | 250 hours |
| Labor cost | 250 × $55 burdened rate | $13,750 |
| Equipment | Lifts and scaffolding | $1,200 |
| Direct cost | Material + labor + equipment | $21,550 |
| Overhead (12%) and profit (10%) | $21,550 × 1.12 × 1.10 | About $26,550 |
Labor is calculated from net quantity, not quantity with waste, because crews install the net area. Markup is applied after overhead; see markup vs. margin for why a 10% markup is not a 10% profit.
How Much Markup Should a Subcontractor Add?
There is no single rate. Overhead depends on company size, and profit depends on risk and market. Specialty trades often run higher net margins than general contractors, but small subs also carry higher overhead per dollar of work. Track your actual overhead as a percentage of revenue each year, then add profit on top; a bid that only covers overhead is a bid that only keeps your crews busy.
Estimating Mistakes That Cost Subcontractors Jobs and Money
| Mistake | Fix |
|---|---|
| Pricing from the plans only | Read your spec sections and Division 01 |
| Waste hidden inside quantities | Show waste on its own line |
| One production rate for everything | Split quantities by height, access and complexity |
| Vague exclusions | List exactly what is not included |
| Missing an addendum | Track addenda on the bid form and update quantities |
| Old material prices | Get new quotes and note the quote date |
| No contingency on renovation work | Add contingency where conditions are unknown |
When to Outsource the Takeoff
If you are bidding more jobs than your team can take off, outsourcing the quantities lets you spend your time on pricing and relationships. Our subcontractor estimating services deliver trade takeoffs in your format in 24 to 48 hours, and our guide to what a subcontractor is covers contracts, retainage and payment terms.
Frequently Asked Questions
Quick answers about pricing subcontractor work.
How do subcontractors price a job?
They take off quantities, price materials, convert quantities to labor hours, add equipment, then add overhead and profit. Inclusions and exclusions define what the price covers.
Should labor be calculated with waste included?
No. Labor is usually based on net installed quantity, while material is based on quantity plus waste.
What should a subcontractor bid include?
The price, scope inclusions and exclusions, alternates, unit prices, acknowledged addenda, schedule assumptions and bond or insurance status.
Why do subcontractor bids vary so much?
Different scope assumptions, production rates, overhead and how much each sub wants the job. Clear exclusions make bids easier to compare.
Can someone else do my takeoff?
Yes. Our human estimators prepare trade takeoffs in your format in 24 to 48 hours, with marked-up drawings so you can check every quantity.
Related Articles
Articles · 10 min readConstruction Estimating for Beginners: How to Build Your First EstimateRead Article →
Articles · 13 min readMasonry Repair Cost: Guide to Brick and Stone PricingRead Article →
Articles · 11 min readRenovation Estimating Services 2026-27: Accurate Pricing GuideRead Article →
Articles · 4 min readHow to Estimate a Painting Job: Painting Takeoff GuideRead Article →
Articles · 5 min readFree General Contractor Estimate Template, Form and Bid Form (PDF and Excel)Read Article →
Articles · 10 min readTypes of Construction Cost Estimates: From Conceptual to DetailedRead Article →Get a Bid-Ready Estimate in 24–48 Hours
Send your drawings and bid date. We'll confirm scope, price and delivery time before any work starts.